top of page

Added new stairs and  railings to both sides of this deck then finished with lattice work.

Added the small bench and refinished the entire deck.

Built shelves and added doors to storage area in a bedroom.

Installed new doors on closets, bathroom, front door, stained and finished.

Front steps and front entrance door on this property to be  replaced after the house was painted.

New front door added and painted to match the trim color of the house.

FdoorO1.jpg
FdoorRe.jpg
FdoorRe1.jpg
FrontFini.jpg
Frontstepsdone.jpg
FrontFin3.jpg

A new screen door added to the front, then replaced the deck, steps and railing. Composite decking was ordered in the gray trim color of the house to replace the deck and steps.  The railings and balusters were replaced and brought up to code then painted to the customer's color selection.

​

BDeckStpO1.jpg
BDeckOld1.jpg
BDeckStepsn1.jpg
BDeckn1.jpg
BDeckn2.jpg

Opened up a wall over the stairwell from the 1st to 2nd floor to add a linen closet.

BDeckPn1.jpg
BDeckdone.jpg

This old back deck on the house was not up to current safety code and

badly in need of replacement.  Replaced the deck, railings and balusters then painted to match the house and trim colors.

Finished and installed this "Live Edge" Pine wood slab as a counter top over floating cabinets I installed.  The wood was harvested in Dorchester, New Hampshire.

Removed old ordinary trim casings around front and back doors, replaced with custom made craftsman style trim.

The owners of this home were looking for resolution to their ever sagging Bay Windows.  My permanent solution for the problem included raising the windows back into place, repairing the cable system inside the soffits, adding structural support within the walls below the windows and more robust wall material and insulation.  I also added support brackets below the windows and painted everything to match the house.   

B4Win2.jpg
B4Win1.jpg
B4Win3.jpg
WallRepair1.jpg
After2.jpg
After4.jpg
WallRepair2.jpg
After3.jpg
After5.jpg
bottom of page